Production Title: HS2: A White Elephant
|
Production Date: 20/20/17
|
Producer name: Dan James, Tayte Fordham
|
Director Name: Dan James, Tayte Fordham
|
Date of risk assessment: 10/10/2017
|
Risk assessment conducted by: Dan James, Tayte Fordham
|
Hazard
|
Persons who may be harmed
|
Property that may be damaged
|
Risk controls already in place
|
Risk Assessment (Low/Moderate/High)
|
Further action to reduce the risk
|
Being hit by trains/Falling into the train tracks
|
Cameramen
|
Train track, train & camera equipment
|
Yellow line not to pass
|
Moderate
|
Brief cameramen the risks and dangers
|
Being hit by cars
|
Cameramen
|
Car
|
Use the paths
|
Low
|
Brief cameramen the risks and dangers
|
Falling down steps
|
Cameramen
|
Camera Equipment
|
Safe shoes and clearing the steps
|
Low
|
Brief cameramen the risks and dangers
|
Falling into river
|
Cameramen
|
Camera equipment
|
Safe shoes
|
Low
|
Brief cameramen the risks and dangers
|
High up, multi storey car park location
|
Cameramen
|
Camera equipment
|
Be careful when near the edge
|
Moderate
|
Brief cameramen the risks and dangers
|
Busy high street
|
Cameramen
|
Camera equipment
|
Ensure space is made around cameramen
|
Low
|
Brief cameramen the risks and dangers
|
No comments:
Post a Comment